ENERGY & FIELD SERVICES
Software for installers
Survey to sign-off for solar, heat pump and retrofit installers. Quotes carry into scheduled jobs, engineers work offline in the van, and the scheme paperwork assembles itself from evidence captured on site rather than from memory a fortnight later.
What we delivered
A single connected platform rather than a shelf of separate products — every module below shares one record, one login and one audit trail, configured around how installers actually run.
The modules involved
- Surveys & quotes
- Scheduling
- Engineer mobile app
- Van stock
- Scheme compliance
- Handover packs
- Aftercare
How delivery actually runs
Week 1 — We come and look
A Business Systems Analyst spends a day inside your business, sitting with the people who actually do the work.
Weeks 2–4 — We build in the open
You see working software every week, not a status report. What is wrong gets said early, while changing it is still cheap.
Week 5 — Your data moves across
Spreadsheets, the old system, the shared drive — migrated, reconciled and checked against what you had.
Week 6 — Go live, then stay live
Training for the people who will use it, then support that answers. We do not hand over a login and disappear.
The systems behind it
A whole-company platform is assembled from the same systems we build for every sector, configured around how installers actually work:
Further reading
Practical writing for installers:
- The EV chargepoint grant in its final year: what installers must evidence on every claim, and how software keeps it — OZEV's chargepoint grants run to 31 March 2027. What authorised installers must evidence on each claim, the audit rights, and how…
- CDM 2015 for small contractors: the construction phase plan, the notification thresholds, and how project software keeps the record — HSE says every construction job needs a construction phase plan, and large ones must be notified.
- F gas records and leak checks for heat pump and air-conditioning businesses: what GOV.UK requires, and how an asset register keeps it — GOV.UK says F gas records must be kept for 5 years and leaks checked on a schedule set by the charge.
- Boiler Upgrade Scheme admin for installers: the deadlines on every job, and how software tracks them — Every Boiler Upgrade Scheme job runs on several clocks: 120 days, 14-day consent, voucher expiry.
- Project variations: the work you did, agreed in a corridor, and never billed — Projects lose money in small agreed changes delivered in full and invoiced never.
- Equipment and asset tracking: what losing track really costs — The hours lost looking for kit, the inspection records HSE expects you to keep, what an asset register should hold, and when…